Amarea Hills Finestrat
An exclusive investment project in Finestrat, Alicante
A premium residential area between Benidorm, the sea and Puig Campana
Private villas & residences
An exclusive investment project in Finestrat, Alicante
A premium residential area between Benidorm, the sea and Puig Campana
Private villas & residences
34
A complex comprising 14 villas and 20 apartments
10 056 m²
Area of a plot in a gated residential estate
Q1 2029
Project implementation period
Location and facilities:
A premium residential area between Benidorm, the sea and Puig Campana
Views of the sea and the mountains
An infinity swimming pool for year-round use
Terraces and rooftop gardens, outdoor living
Active landscaping of the area

Within walking distance:
By car:
From 300 000€
The cost of buying an apartments
From 500 000€
The cost of buying a villas

Ground floor

Second floor

Rooftop

"SMART-HOME" technology
A smart home control system allows you to control the lighting, climate and other building services via a smartphone or touchscreen panel.

Leading moisture extraction and ventilation systems
Modern engineering solutions ensure the effective removal of excess moisture and a constant air exchange.

Air recirculation system with CO₂ sensors
Smart ventilation with heat recovery ensures a constant supply of fresh air, reducing heat loss.

Premium-class windows (Germany)
High-quality German-made window systems combine modern design with excellent thermal and sound insulation.

Advanced soundproofing system
Multi-layered sound-insulating materials effectively reduce the penetration of external noise and the transmission of sound between rooms.

Underfloor heating
A modern underfloor heating system ensures that heat is distributed evenly throughout the room, creating a comfortable indoor climate.
September 2026
Finalising the land deal, drawing up the project structure, and the basic design
November 2026
Obtaining a building licence for a specific purpose
December 2026
Preparatory work and site preparation
Q1 2027
Planned start of construction
Q3 2027
The first planned exit point for an investor is in approximately 12 months’ time
Q3 2028
The second planned exit point is in approximately 24 months’ time
Q1 2029
Scheduled commissioning of the project
The timeframes for obtaining a licence and for construction depend on municipal procedures, contractors and market conditions.
Investors receive regular updates on the project’s status.
The apartments and villas are designed in line with modern standards of comfort and must be ready to welcome residents.
Book a personal consultation with a manager!
Submit a request for a consultation to find out more about the project and the available investment options, and to get answers to your questions:
