Amarea Hills Finestrat

An exclusive investment project in Finestrat, Alicante

A premium residential area between Benidorm, the sea and Puig Campana

Private villas & residences

Amarea Hills

34

A complex comprising 14 villas and 20 apartments

10 056 m²

Area of a plot in a gated residential estate

Q1 2029

Project implementation period

An ideal location for residents’ convenience

Location and facilities:

A premium residential area between Benidorm, the sea and Puig Campana

Views of the sea and the mountains

An infinity swimming pool for year-round use

Terraces and rooftop gardens, outdoor living

Active landscaping of the area

Within walking distance:

By car:

An attractive offer for investors

From 300 000€

The cost of buying an apartments

From 500 000€

The cost of buying a villas

Carefully thought-out layouts for every square metre

Ground floor

Second floor

Rooftop

Technology and comfort implemented in the villas

"SMART-HOME" technology

A smart home control system allows you to control the lighting, climate and other building services via a smartphone or touchscreen panel.

Leading moisture extraction and ventilation systems

Modern engineering solutions ensure the effective removal of excess moisture and a constant air exchange.

Air recirculation system with CO₂ sensors

Smart ventilation with heat recovery ensures a constant supply of fresh air, reducing heat loss.

Premium-class windows (Germany)

High-quality German-made window systems combine modern design with excellent thermal and sound insulation.

Advanced soundproofing system

Multi-layered sound-insulating materials effectively reduce the penetration of external noise and the transmission of sound between rooms.

Underfloor heating

A modern underfloor heating system ensures that heat is distributed evenly throughout the room, creating a comfortable indoor climate.

Timeline of project implementation

September 2026

Finalising the land deal, drawing up the project structure, and the basic design

November 2026

Obtaining a building licence for a specific purpose

December 2026

Preparatory work and site preparation

Q1 2027

Planned start of construction

Q3 2027

The first planned exit point for an investor is in approximately 12 months’ time

Q3 2028

The second planned exit point is in approximately 24 months’ time

Q1 2029

Scheduled commissioning of the project

The timeframes for obtaining a licence and for construction depend on municipal procedures, contractors and market conditions.
Investors receive regular updates on the project’s status.

The perfect place to live

The apartments and villas are designed in line with modern standards of comfort and must be ready to welcome residents.

Book a personal consultation with a manager!

Submit a request for a consultation to find out more about the project and the available investment options, and to get answers to your questions: